AI Skill Report Card

Performing Civil Engineering Design

A-84·Nov 26, 2026·Source: Web
14 / 15

Open every engineering response with this scaffold, then fill it in before calculating anything:

ENGINEERING BRIEF
Discipline:        [structural | geotechnical | transport | water | construction]
Location/Code set: [e.g. Johannesburg → SANS 10100-1, SANS 10160, SANS 10400]
Deliverable status: [conceptual | preliminary | for formal review]

GIVEN (confirmed by user):   ...
ASSUMED (flagged, to verify): ...
MISSING (blocks finalisation): ...

Then proceed: Assumptions → Given Data → Governing Equations → Step-by-Step Calculation (units at every step) → Sanity Check → Constructability/Risk → Recommendations.

End every response with:

Disclaimer: This AI-generated output is preliminary. All calculations and recommendations must be independently checked and approved by a registered Pr.Eng/PE before construction or implementation.

Recommendation▾
Add a good-versus-bad example pair. For instance, show a poor response that silently assumes soil parameters or fabricates a clause number next to the corrected response. Also add a worked example from a second discipline (geotechnical, culvert hydraulics) so the skill isn't concrete-beam-centric.
14 / 15

Copy and track progress:

Progress:
- [ ] Step 1: Classify problem (discipline, objective, jurisdiction)
- [ ] Step 2: Validate inputs (confirmed vs assumed vs missing)
- [ ] Step 3: Establish design criteria and codes (state editions)
- [ ] Step 4: Analyse and calculate (units throughout)
- [ ] Step 5: Verify (independent check, code limits, reasonableness)
- [ ] Step 6: Constructability and risk review
- [ ] Step 7: Present solution (tables, schedules, sketch guidance)
- [ ] Step 8: Final review (outstanding items, status, next steps)

Step 1: Classify

Identify discipline, scope, deliverable, and jurisdiction. If location is unknown, ask before selecting codes.

Step 2: Validate inputs

Split everything into Confirmed / Assumed / Missing. Stop and ask when a missing parameter materially affects the result:

Missing itemWhy it blocks
Support conditions / span type (clear vs effective)Changes moments, shear, and deflection
Concrete grade, steel gradeGoverns capacities
Whether loads are characteristic or factored, and whether self-weight is includedRisks double counting or omission
Exposure class, fire ratingGoverns cover and member sizing
Soil parameters / geotechnical reportFoundations cannot be designed without them
Load cases, tributary widthsGoverns actions

If proceeding on assumptions, label the output "Preliminary illustrative, not a verified design".

Step 3: Codes

Default to South African standards, then international where appropriate.

  • SA: SANS 10100-1 (concrete), SANS 10162 (steel), SANS 10160 (actions/combinations), SANS 10400 (building regs), SANS 2001 (construction works), COLTO/COTO, SANRAL, and municipal specs.
  • International: Eurocodes (EN 1990–1999), ACI 318, AISC 360, ASCE 7, AASHTO, ASTM, BS/ISO.
  • State the edition and assumptions used. Never invent clause numbers or code requirements. If unsure of a clause, cite the code and topic only, and flag it for verification.

Step 4: Calculate

For every calculation block, present:

  1. Given parameters (with units)
  2. Governing equation (named)
  3. Substitution
  4. Result (with units)
  5. Code reference (code and topic, only clauses you are certain of)

Keep units explicit at every line (kN, kN/m, kNm, mm, MPa). Check dimensional consistency before moving on.

Step 5: Verify

  • Equilibrium and reaction check (ΣV = total load)
  • Compare against code limits (min/max steel, spacing, deflection ratios)
  • Order-of-magnitude check against rules of thumb (e.g. span/depth ratios)
  • Flag any result that looks unusual and say why

Step 6: Constructability and risk

Always address: reinforcement congestion and concrete placement, tolerances and cover, drainage, groundwater, settlement, durability, temporary works, access, and sequencing. Name the likely failure modes and the practical mitigation.

Step 7–8: Present and close

State status (conceptual / preliminary / for formal review), list outstanding information and approvals, and recommend next steps.

Recommendation▾
Fix the beam example, which is supposed to demonstrate rigor but contains a questionable step. K = 0.0275 with z = 0.95d, then 'ρ ≈ 0.24%, low, so minimum steel likely governs' sits next to a provided 402 mm² that exceeds the 368 mm² required without showing the min-steel value. Show the actual minimum-steel, shear, and deflection checks, or explicitly mark them 'outstanding' in the calculation block, so the exemplar models the verification it demands.
15 / 20

Example 1: Incomplete input (ask first)

Input: "Design a retaining wall, 3 m high, in Cape Town."

Output (abridged):

Status: Cannot finalise. Critical parameters missing.

  • Missing: backfill and foundation soil parameters (φ′, c′, γ, allowable bearing), groundwater level, surcharge, wall type, geotechnical report.
  • Can proceed to preliminary sizing only if you confirm or accept these assumptions: [list with values, each flagged Assumed, to verify].
  • Code basis: SANS 10160 (actions), SANS 10100-1 (concrete), plus the geotechnical code applicable to your project.
  • Please supply the geotechnical report or confirm the assumptions above.

Example 2: Reinforced concrete beam (preliminary)

Input: Simply supported RC beam, Johannesburg, 6.0 m span, 300×600 mm, fcu = 30 MPa, fy = 450 MPa, superimposed dead 3.0 kN/m, imposed 5.0 kN/m.

Output (abridged):

ASSUMPTIONS (flagged): Span is effective span; loads characteristic and exclude
self-weight; cover 30 mm (mild exposure, 1 h fire, to confirm); links Ø8;
main bars Ø20 → d ≈ 600 − 30 − 8 − 10 = 552 mm; ρconc = 24 kN/m³.

1. Self-weight   = 0.30 × 0.60 × 24 = 4.32 kN/m
2. Gk = 3.0 + 4.32 = 7.32 kN/m ; Qk = 5.0 kN/m
3. ULS: wu = 1.2Gk + 1.6Qk (SANS 10160 combination, verify factors)
        = 1.2(7.32) + 1.6(5.0) = 8.78 + 8.00 = 16.78 kN/m
4. Mu = wu L²/8 = 16.78 × 6.0² / 8 = 75.5 kNm
   Vu = wu L/2  = 16.78 × 6.0 / 2   = 50.3 kN
5. K = Mu/(fcu b d²) = 75.5e6 / (30 × 300 × 552²) = 0.0275 (< 0.156 → singly reinforced)
6. z = d[0.5 + √(0.25 − K/0.9)] ≈ 0.95d (cap per SANS 10100-1)
   As = Mu/(0.87 fy z) = 75.5e6 / (0.87 × 450 × 0.95 × 552) ≈ 368 mm²
7. Provide 2Ø16 (402 mm²), subject to min steel, spacing, and deflection checks.
8. Sanity check: span/depth = 6000/552 ≈ 10.9, well within typical limits; ρ ≈ 0.24%,
   low, so minimum steel likely governs, so check it.

Reinforcement schedule (preliminary): 2Ø16 bottom, 2Ø12 hangers, Ø8 links at spacing per shear design. Risks: shear and anchorage at supports, cover tolerance, deflection check outstanding. Status: Preliminary. Not verified for construction. Followed by the mandatory disclaimer.

Recommendation▾
Reduce redundancy and add reusable templates. Pitfalls and Best Practices repeat points already made in Steps 2, 3, and 5 (assumptions, fabricated clauses, units, disclaimer). Merge them into one short checklist, and use the freed space for a preliminary design report skeleton plus short ITP and method-statement templates, since the description promises reports, ITPs, and BOQs but the body provides none.
  • Lead with assumptions. A reviewing engineer should see what was assumed before seeing any numbers.
  • Be conservative where data is thin. Round loads up and capacities down, and say so.
  • Check independently. Re-derive reactions, compare against rules of thumb, and sanity-check reinforcement ratios.
  • Distinguish clearly between hand calculation, software output, conceptual advice, and verified design.
  • Prioritise in order: public safety → compliance → structural integrity → durability → constructability → economy.
  • Use tables and schedules for reinforcement, loads, and load combinations so the output is auditable.
  • Challenge the brief. Behave as a Principal reviewing a junior's work: question inputs, flag risks, and explain decisions.
  • For software-dependent tasks (ETABS, PLAXIS, HEC-RAS, etc.), provide hand calculations, pseudocode, or a reproducible workflow, and say what the software run should confirm.
  • Silently assuming missing parameters. Always list assumptions explicitly, or ask.
  • Fabricating code clauses, test data, soil parameters, or design approvals. If you are not certain of a clause, say so.
  • Claiming a software analysis was run when it wasn't.
  • Double counting or omitting self-weight, and mixing characteristic with factored loads.
  • Mixing units (kN vs N, mm vs m) mid-calculation.
  • Ignoring serviceability (deflection, cracking) after passing ULS.
  • Ignoring constructability: congested bars, unachievable cover, no drainage behind walls, no groundwater consideration.
  • Using the wrong code set for the jurisdiction. Confirm the location first.
  • Presenting a preliminary calculation as construction-ready. Always state the status.
  • Omitting the Pr.Eng/PE verification disclaimer.

Note: this skill is concise by design. For discipline-specific depth, split into separate reference files (e.g. structural-concrete.md, geotechnical.md, hydraulics.md, report-templates.md) and link them from here.

0
Grade A-AI Skill Framework
Scorecard
Criteria Breakdown
Quick Start
14/15
Workflow
14/15
Examples
15/20
Completeness
16/20
Format
14/15
Conciseness
13/15