Writing Project Handover Documents
Produce the document in this structure, using British English and a professional, factual tone. Populate it from the SOW, change requests, HaloPSA ticket/project notes, and any engineer notes supplied.
Markdown# Project Handover Document: [Project Name] | | | |---|---| | **Client** | [Client name] | | **Project reference** | [HaloPSA project/SOW ref] | | **Document version** | 1.0 | | **Date** | [DD Month YYYY] | | **Prepared by** | [Name, Dynamic Networks Group] | | **Project dates** | [Start] to [Completion] |
[3-5 sentences: what the client asked for, what was delivered, outcome, any headline caveats]
[Table: SOW item | Status | Notes]
Copy this checklist and track progress:
Progress:
- [ ] Step 1: Gather source material (SOW, CRs, ticket notes, engineer notes)
- [ ] Step 2: Reconcile delivered work against original scope
- [ ] Step 3: Categorise every change as Created, Changed, or Removed
- [ ] Step 4: Write the implementation narrative
- [ ] Step 5: Capture as-built configuration
- [ ] Step 6: Record testing evidence and outstanding items
- [ ] Step 7: Quality check against the rules below
- [ ] Step 8: Output final document
Step 1: Gather source material
Collect or ask for only what is missing. Do not ask for everything upfront; work with what has been provided and mark gaps clearly (see Pitfalls).
Priority sources:
- SOW / quote: the contractual baseline
- Change requests: scope variations, with HaloPSA refs
- HaloPSA project and ticket notes: the timeline and actions taken
- Engineer notes / time entries: the technical detail
- Test results / screenshots: the validation evidence
Step 2: Reconcile against scope
Build a table comparing each SOW line item and each approved CR to its outcome.
| Ref | Item | Status | Notes |
|---|---|---|---|
| SOW 2.1 | Migrate 45 mailboxes to Exchange Online | Complete | All migrated; 2 shared mailboxes converted |
| SOW 2.4 | Configure Conditional Access baseline | Complete | 4 policies, report-only for 7 days then enforced |
| CR-0012 | Add SharePoint migration for Finance | Complete | Approved by [Name], [date] |
| SOW 2.6 | Intune compliance policies for macOS | Descoped | Client confirmed no macOS devices; see CR-0014 |
Status values: Complete, Complete with notes, Partially complete, Descoped, Not started. Never leave a SOW item out. If it was not delivered, say so and say why.
Step 3: Categorise every change
Every action goes into exactly one bucket:
- Created / Added: new objects, services, policies, licences, accounts, sites, connectors
- Changed: existing items modified (settings, naming, membership, licensing tier)
- Removed / Decommissioned: anything deleted, disabled, retired, unlicensed, or switched off
The Removed section matters most for audit and rollback, so be exhaustive. State whether each removal is permanent, disabled and retained (with retention date), or scheduled for deletion.
Step 4: Write the implementation narrative
Describe how in chronological phases, not as a command log. Each phase: what was done, the method, and any deviation from plan.
Template per phase:
**Phase [n]: [Name]** ([dates])
[2-4 sentences: approach, tooling, notable decisions]
Deviations: [None / description and reason]
Name the tooling used (e.g. Exchange Online hybrid migration, Intune, Entra Connect, Microsoft 365 admin centre, PowerShell) without explaining what the tools are.
Step 5: Capture as-built configuration
Record the final state, not the plan. Use tables for anything enumerable. Include only what the client's IT or a future engineer needs to support the environment. Never include passwords, secrets, API keys or recovery codes; reference where they are stored (e.g. "stored in client's IT Glue vault, folder X").
Step 6: Testing, outstanding items, recommendations
- Testing: what was tested, by whom, result, date
- Outstanding: anything unfinished, with owner and target date
- Recommendations: phrased as advice, and flag anything that would be chargeable as new work, referencing that a new SOW or CR would be required
Step 7: Quality check
Before output, verify:
- Every SOW line and CR appears in Scope Reconciliation
- Every item in Removed states permanence and retention
- No credentials or secrets present
- All dates use DD Month YYYY
- No claims that are not supported by the source material
Example 1: Created / Added section
Input: Engineer notes say "built 4 CA policies, made a break glass account, set up Defender for Business on all 38 devices, new SharePoint site for Finance"
Output:
Markdownundefined
Identity and Access
| Item | Detail | Location |
|---|---|---|
| CA-001 Require MFA for all users | Enforced; excludes break-glass group | Entra ID > Conditional Access |
| CA-002 Block legacy authentication | Enforced | Entra ID > Conditional Access |
| CA-003 Require compliant device for Microsoft 365 | Enforced after 7-day report-only period | Entra ID > Conditional Access |
| CA-004 Require MFA for administrative roles | Enforced | Entra ID > Conditional Access |
| Break-glass account | Cloud-only, excluded from all CA policies, credentials stored in client's secure vault | Entra ID > Users |
Endpoint Security
| Item | Detail |
|---|---|
| Microsoft Defender for Business | Deployed and onboarded to 38 of 38 devices |
Collaboration
| Item | Detail |
|---|---|
| SharePoint site "Finance" | New communication site; Finance team given Member access, Finance Director as Owner |
**Example 2: Removed / Decommissioned section**
Input: "Turned off the old on-prem Exchange server, removed the legacy VPN, deleted 12 stale AD accounts, took away E3 licences from leavers"
Output:
```markdown
| Item | Action | Permanence | Retention / Date |
|---|---|---|---|
| On-premises Exchange 2016 server (EXCH01) | Powered off, removed from hybrid configuration | Disabled and retained | VM retained 30 days; deletion scheduled 14 March 2025 |
| Legacy VPN (Cisco ASA remote access) | Remote access profile disabled | Disabled and retained | Config backup stored; client to confirm hardware disposal |
| 12 stale AD user accounts | Deleted | Permanent | Listed in Appendix A; recoverable from AD Recycle Bin until 30 days after deletion |
| 3 x Microsoft 365 E3 licences | Unassigned from leavers | Permanent | Licences returned to pool; no renewal required |
Rollback note: EXCH01 can be restored from the retained VM within the 30-day window. After deletion, rollback is not possible.
**Example 3: Scope reconciliation with a descoped item**
Input: SOW included Autopilot for 50 devices but client only needed 38 and cancelled macOS work.
Output:
```markdown
| SOW 2.5 | Autopilot deployment for 50 devices | Complete with notes | 38 devices deployed; reduced from 50 per CR-0013 (client headcount change) |
| SOW 2.6 | Intune compliance for macOS | Descoped | No macOS devices in estate; agreed in CR-0014 |
- Write for two readers: a client sponsor who wants the executive summary, and a future engineer who needs the as-built detail. Keep the summary non-technical and the later sections precise.
- Use tables for anything enumerable (policies, users, devices, licences, DNS records). Use prose only for narrative.
- Link to evidence: reference HaloPSA ticket numbers, CR numbers and attached test results rather than reproducing them.
- Be honest about deviations: a handover that hides a descope or workaround creates support problems later and damages trust.
- State licensing impact: note any licence changes affecting the client's monthly billing.
- Separate recommendations from deliverables: anything outside the signed scope belongs in Section 9, flagged as requiring a new SOW or CR.
- Appendices for bulk data: long lists (user lists, device lists, DNS records) go in appendices, not the main body.
- Keep to British English: organisation, licence (noun), authorise, colour.
- Inventing detail. If the source material does not state it, write
[TO CONFIRM: description]rather than guessing. Never fabricate counts, dates, names or configuration values. - Omitting removals. Engineers log what they built and forget what they deleted. Actively look for decommissioning, disabled accounts, removed licences and retired services.
- Copy-pasting ticket notes verbatim. Internal shorthand and engineer commentary do not belong in a client-facing document. Rewrite professionally.
- Including credentials. Never write passwords, secrets, keys or recovery codes in the document, even if they appear in the source notes.
- Ignoring change requests. The handover must reconcile against the SOW as amended, not the original alone.
- Vague language. Avoid "some", "various", "a number of". Give counts and names.
- Promising future work. Do not commit DNG to follow-up work in the document. Recommend it and note that a separate SOW or CR is required.
- Unsigned-off scope changes. If work was done outside an approved CR, flag it for Craig's review rather than presenting it as in scope.
If the finished document exceeds roughly 500 lines, keep the main document to Sections 1 to 11 and split the bulk detail (full user lists, DNS records, device inventories) into separate appendix files referenced from the main document.