AI Skill Report Card

Preparing Design Documentation

A-83·Nov 8, 2026·Source: Web
13 / 15

For a new design package, establish the standard first — it drives everything downstream:

1. Standard: ГОСТ (ЕСКД) | ISO | ASME Y14.5
2. Title block (основная надпись): per ГОСТ 2.104 / ISO 7200 / ASME Y14.1
3. Drawing set: assembly dwg + detail dwgs + spec (ГОСТ 2.106) + BOM
4. Explanatory note (ПЗ): calculations, material justification, standards compliance
5. Normcontrol (нормоконтроль) pass
6. Release into PLM with revision index (01, 02... or A, B...)

If unsure which standard applies, ask: who is the customer/regulator (Russian GOST-regulated industry → ЕСКД; export to EU → ISO; US/aerospace client → ASME)? Default to ЕСКД for domestic Russian industrial projects.

Recommendation▾
Add a bad-example contrast (e.g., show a drawing package that fails normcontrol and why) to strengthen the examples section
14 / 15

Progress:

  • Step 1: Determine governing standard (ГОСТ/ЕСКД, ISO, ASME, DIN) and customer-specific deviations
  • Step 2: Set up title block, borders, zones, revision table (ГОСТ 2.104 / ISO 7200 / ASME Y14.1)
  • Step 3: Generate associative 2D drawings from 3D model (SolidWorks/Inventor/Компас-3D)
  • Step 4: Apply dimensions, tolerances, GD&T, surface roughness (ГОСТ 2.307, ISO 1101, ASME Y14.5)
  • Step 5: Build specification/BOM (ГОСТ 2.106 спецификация, or ISO parts list)
  • Step 6: Write explanatory note (ПЗ) — purpose, calculations, standards references, conclusions
  • Step 7: Internal normcontrol check — formatting, references, consistency between dwg/spec/ПЗ
  • Step 8: Approval cycle (checker → normcontrol → chief engineer signatures)
  • Step 9: Release into PLM (Teamcenter/Windchill/Enovia) with revision index and ECN if applicable
  • Step 10: Archive and link to ERP/knowledge base for reuse

Standard mapping cheat-sheet:

ElementЕСКДISOASME
Title blockГОСТ 2.104ISO 7200ASME Y14.1
DimensioningГОСТ 2.307ISO 129-1ASME Y14.5
TolerancesГОСТ 25346ISO 286ASME Y14.5
SpecificationГОСТ 2.106EN parts listASME parts list
ChangesГОСТ 2.503 (извещение)ISO change noticeECN/ECO
Recommendation▾
Expand on GD&T specifics or link to a reference for feature control frame construction since ASME Y14.5 is deep enough to warrant more detail
16 / 20

Example 1: Input: Gearbox (редуктор) design package — 47 drawings, spec, ПЗ, ЕСКД required, source is a 3D model in Компас-3D. Output: Associative drawings auto-generated from 3D → manual GD&T refinement → spec per ГОСТ 2.106 → ПЗ in LaTeX with strength/thermal calculations → normcontrol pass with 0 remarks → released package in Teamcenter synced to ERP. Delivered in 5 days vs. 3-week baseline; became a reusable template for 15 future projects.

Example 2: Input: Single bracket part needs a drawing for a US customer under ASME Y14.5. Output: Detail drawing with ASME title block (Y14.1), third-angle projection, GD&T feature control frames for flatness/position, surface finish callouts per ASME Y14.36, tolerance block in inches/mm dual dimensioning, revision block starting at "A".

Example 3: Input: Mid-project change — hole diameter revised after tolerance stack-up failure. Output: Issue извещение об изменении (ECN) per ГОСТ 2.503, bump revision index, update drawing/spec/ПЗ in lockstep, log change reason and affected documents, re-run normcontrol on changed sheets only, notify PLM subscribers.

Recommendation▾
Clarify ECN workflow with a small template or sample extract (what fields an извещение needs) to make Step 9/10 more actionable
  • Always generate 2D drawings from the 3D model associatively — never redraw manually; it breaks sync and causes mismatches during revisions.
  • Keep drawing, specification, and ПЗ consistent — cross-check part numbers, designations, and quantities before submitting to normcontrol.
  • Apply tolerances only where functionally required (fits, GD&T) — over-tolerancing inflates cost and triggers normcontrol pushback.
  • Use standard templates (ГОСТ-шаблоны in Word/LaTeX, Компас-3D/SolidWorks title block templates) to avoid formatting errors from scratch each time.
  • Version every released document with a clear revision index and maintain a change log (ECN) — never silently overwrite a released drawing.
  • Store the completed package in PLM (Teamcenter/Windchill/Enovia) with ERP linkage so BOM changes propagate automatically.
  • Build a reusable knowledge base/template library from completed projects — cuts future turnaround time significantly (as in the gearbox example: 5 days vs. 3 weeks).
  • Mixing standards within one package (e.g., ISO tolerancing symbols on a ГОСТ title block) — pick one standard and apply it consistently.
  • Skipping normcontrol until the end — catch formatting/reference errors early, per-sheet, not in one large batch.
  • Manually editing auto-generated drawing views without updating the source 3D model — causes drift between model and drawing.
  • Releasing a drawing change without a corresponding ECN/извещение — breaks traceability and change history.
  • Forgetting to update the specification/BOM and ПЗ when a drawing dimension changes — causes assembly and procurement errors downstream.
  • Over- or under-specifying tolerances without a stack-up analysis — leads to either unmanufacturable parts or functional failures.
0
Grade A-AI Skill Framework
Scorecard
Criteria Breakdown
Quick Start
13/15
Workflow
14/15
Examples
16/20
Completeness
17/20
Format
14/15
Conciseness
13/15